Capital improvement plan
226 projects
MCFD Headquarters San Geronimo Commons
- Cost estimate
- $75,000,000
Hicks Valley Fire Station Replacement
- Cost estimate
- $16,000,000
MCFD Administration Tenant Improvements
- Cost estimate
- $8,000,000
MCFD Fire Foundry - College of Marin
- Cost estimate
- $30,000,000
Distributed Antenna System - 1600 Los Gamos Dr.
- Cost estimate
- $2,000,000
Marin City Fire Dorm Reconfiguration
- Cost estimate
- $1,500,000
Sheriff's Sub-Station - College of Marin
- Cost estimate
- $2,000,000
Woodacre Fire Dept Bathroom Remodel
- Cost estimate
- $850,000
Woodacre Fire Station Apparatus Bay Heaters
- Cost estimate
- $136,775
Throckmorton Fire Station AC Paving
- Cost estimate
- $100,000
Waterline Replacement at Barnaby Look Out
- Cost estimate
- $250,000
Linda Drive Culvert Replacement
- Cost estimate
- $188,629
Gallinas Creek Dredge
- Cost estimate
- $11,900,000
- Additional funds needed
- $4,000,000
Countywide Small Trash Capture Device Installation
- Cost estimate
- $400,000
Green Stormwater Infrastructure Improvement Project
- Cost estimate
- $11,000,000
Trash Capture Devices (Shoreline, Seminary, Goodmans, Blithedale)
- Cost estimate
- $5,678,043
Seaview Ave Drainage Improvements
- Cost estimate
- $400,000
2027 Drainage Program
- Cost estimate
- $400,000
2028 Drainage Program
- Cost estimate
- $400,000
2029 Drainage Program
- Cost estimate
- $400,000
2030 Drainage Program
- Cost estimate
- $1,500,000
2031 Drainage Program
- Cost estimate
- $1,500,000
432 Woodland Rd, Kent Woodland - Culvert Repair
- Cost estimate
- $187,877
2026 Minor Drainage Projects
- Cost estimate
- $200,000
Bretano Way and SFD Culvert Repair
- Cost estimate
- $98,649
Santa Venetia Floodwall
- Cost estimate
- $30,500,000
- Additional funds needed
- $25,000,000
Crest Marin Pump Station Rehabilitation
- Cost estimate
- $7,140,000
Cardinal Levee Seepage Mitigation
- Cost estimate
- $6,400,000
- Additional funds needed
- $4,100,000
Marin City Gateway Pump Station
- Cost estimate
- $15,850,000
- Additional funds needed
- $15,000,000
Novato Creek Dredge 2026
- Cost estimate
- $2,200,000
Mill Valley Sycamore Pump Station Rehabilitation
- Cost estimate
- $2,700,000
East & West Creek Restoration
- Cost estimate
- $3,660,000
Corte Madera Creek Flood Risk Management
- Cost estimate
- $18,213,270
Lagoon Park Restroom Replacement
- Cost estimate
- $1,805,000
McInnis Park Restroom Replacement
- Cost estimate
- $1,750,000
Park AC Corte Madera Pathway
- Cost estimate
- $60,000
Lucas Valley Field Office Renovation
- Cost estimate
- $2,244,340
McGlashan Pathway Phase 2
- Cost estimate
- $170,000
Mill Valley-Sausalito MUP & Marsh Adaptation (Design)
- Cost estimate
- $2,600,000
McInnis Inclusive Playground
- Cost estimate
- $5,424,950
- Additional funds needed
- $5,000,000
Cascade Fountain Renovation
- Cost estimate
- $1,100,000
Point Reyes Restroom Expansion Project
- Cost estimate
- $3,347,000
Mill Valley Bridges (1 & 2) Repairs
- Cost estimate
- $1,000,000
Stafford Park Waterline Replacement
- Cost estimate
- $3,082,620
Lagoon Park Pathway Gap Closure
- Cost estimate
- $1,500,000
120 N. Redwood HHS Entry/Exit Hardware
- Cost estimate
- $150,000
20 NSP Roof Replacement
- Cost estimate
- $275,000
120 N. Redwood HHS Path of Travel Ramp
- Cost estimate
- $330,000
10 NSP Mechanical + BMS
- Cost estimate
- $2,000,000
Fairfax Library - HVAC Replacement
- Cost estimate
- $500,000
120 N. Redwood HHS Cooling Tower
- Cost estimate
- $1,000,000
Novato Library Rehabilitation Project
- Cost estimate
- $9,000,000
Fairfax Library Rehabilitation Project
- Cost estimate
- $9,000,000
Corte Madera Library Rehabilitation Project
- Cost estimate
- $6,500,000
20 NSP Mechanical + BMS
- Cost estimate
- $275,000
3070-3270 HHS Kerner Campus BMS
- Cost estimate
- $1,100,000
120 N Redwood HHS Cabling Modernization
- Cost estimate
- $1,000,000
Library Refresh at 10 Locations
- Cost estimate
- $3,500,000
10 NSP Roof Replacement
- Cost estimate
- $275,000
Juvenile Service Center Mechanical + BMS
- Cost estimate
- $1,000,000
MC Jail Cell Improvements and Related Work
- Cost estimate
- $11,278,000
Juvenile Hall Accessibility
- Cost estimate
- $2,346,320
Library of Things & Library Vending
- Cost estimate
- $500,000
Juvenile Hall HVAC Replacement
- Cost estimate
- $2,131,000
Airport Fuel Farm Secondary Containment [Near Term]
- Cost estimate
- $615,000
Juvenile Hall Video System Replacement
- Cost estimate
- $3,875,000
Jail Entry Gate
- Cost estimate
- $1,000,000
Juvenile Hall Path of Travel Improvements
- Cost estimate
- $1,650,000
Nicasio Crew Space Update
- Cost estimate
- $1,100,000
350 Ignacio Blvd. Tenant Improvements and Deferred Maintenance
- Cost estimate
- $3,000,000
Juvenile Hall Hard Wire Fire System
- Cost estimate
- $250,000
Marin City Fire Station HVAC Replacement
- Cost estimate
- $150,000
Marin County Jail Door Replacement
- Cost estimate
- $200,000
Jail Kitchen HVAC Replacement
- Cost estimate
- $70,000
Corp Yard Modernization & Safety Enhancements
- Cost estimate
- $1,600,000
Marin Civic Center Window Film
- Cost estimate
- $2,500,000
Remove Excess Vegetation from Civic Center Building Perimeter
- Cost estimate
- $250,000
Refresh Civic Center Restrooms
- Cost estimate
- $1,000,000
Civic Center Library Rehabilitation Project
- Cost estimate
- $4,000,000
Civic Center Interior Wayfinding & Visitor Enhancements
- Cost estimate
- $1,000,000
Civic Center Landscaping Enhancements
- Cost estimate
- $1,750,000
Aim Farmers Market Parking Lot - County Grant
- Cost estimate
- $2,500,000
VMA Building Systems Rehabilitiation
- Cost estimate
- $23,987,120
Civic Center Building Frontage Safety Barriers & Fencing
- Cost estimate
- $300,000
Civic Center Emergency Back Up Power
- Cost estimate
- $2,170,250
Demo Concessions Building & Temp. Storage Replacement
- Cost estimate
- $800,000
Space Planning Misc Projects
- Cost estimate
- $2,900,919
MCC HVAC Phase 5-Air Side System -HOJ Phasing
- Cost estimate
- $20,090,548
Civic Center & Marin Center Exterior Lighting Replacement
- Cost estimate
- $12,000,000
Civic Center HVAC Chilled Water Plant
- Cost estimate
- $14,600,000
MCC HVAC Phase 6- Air Side System Admin Building
- Cost estimate
- $14,123,324
Dome Mats on Lagoon Island Bridges -Phase 2 [Long Term]
- Cost estimate
- $200,000
Install Gate at Civic Center Dumpster Access Driveway
- Cost estimate
- $10,000
Civic Center Café Renovations
- Cost estimate
- $12,000,000
Wayfinding Signage: Civic Center, VMA, and Marin Center
- Cost estimate
- $1,500,000
Fairgrounds Electrical Upgrades
- Cost estimate
- $3,000,000
Civic Center South Arch Ramp/Lift and Visitor Booth
- Cost estimate
- $650,000
MCC HVAC Phase 4-Computer Room Reliability
- Cost estimate
- $2,700,000
Peter Behr Drive Pathway & Streetscape Enhancements
- Cost estimate
- $2,321,940
Marin Civic Center Skylight Replacement
- Cost estimate
- $13,250,000
MCC HVAC Phase 3- Hot Water Plant Upgrades
- Cost estimate
- $11,710,447
Assessor/Finance Department Shared Counter Improvements
- Cost estimate
- $1,000,000
Assessor Room 212 Tenant Improvements
- Cost estimate
- $996,000
DOF Reorganization Rooms 209, 217, 225
- Cost estimate
- $534,000
HOJ Assessor 232 - 234 19-0309
- Cost estimate
- $680,000
15-MPH Unincorporated Marin County School Zones
- Cost estimate
- $141,000
Traffic- HSIP Cycle 12 Butterfield @ Irving Crosswalk
- Cost estimate
- $350,000
Pt Reyes-Petaluma Rd-Nicasio Turn Pocket - HSIP Cycle 10
- Cost estimate
- $3,200,000
Active Chevron Warning Signs and HFST - Cycle 11 - (State)
- Cost estimate
- $1,550,000
Traffic Safety Quick Build Projects (Marin City & Other)
- Cost estimate
- $200,000
Install RRFB and Radar Signs - HSIP (State) Cycle 11
- Cost estimate
- $475,000
Install Radar Signs at 3 Locations - HSIP (State) Cycle 11
- Cost estimate
- $290,000
E. SFD Bike Enhancements Study
- Cost estimate
- $791,000
Radar Speed Feedback Signs and Trailer - HSIP Cycle 12
- Cost estimate
- $441,180
Ricardo Lane Sidewalk
- Cost estimate
- $650,000
ADA Improvement Project - Various Locations
- Cost estimate
- $250,000
Rocky Graham Park - Marin City Crosswalk
- Cost estimate
- $100,000
Drake and Donahue Intersection Enhancements
- Cost estimate
- $600,000
East Sir Francis Drake Bay Trail Multiuse Path Gap Closure
- Cost estimate
- $3,000,000
Install Radar Speed Feedback Signs
- Cost estimate
- $300,000
College-Kent-Woodland Traffic Circle Quick Build Project
- Cost estimate
- $325,000
College and SFD Reconfiguration
- Cost estimate
- $300,000
Novato Library Pathway Rehabilitation
- Cost estimate
- $1,250,000
2027 Ped Bike and Safety Quick Build Program
- Cost estimate
- $220,000
2028 Ped Bike and Safety Quick Build Program
- Cost estimate
- $300,000
2029 Ped Bike and Safety Quick Build Program
- Cost estimate
- $400,000
2030 Ped Bike and Safety Quick Build Program
- Cost estimate
- $500,000
2031 Ped Bike and Safety Quick Build Program
- Cost estimate
- $500,000
San Antonio Rd. Widening & Bike Lanes
- Cost estimate
- $1,390,000
NSP Venetia Valley School Crosswalk Improvement (bulb outs)
- Cost estimate
- $200,000
Marinwood New Traffic Signals: Marinwood/Miller, Miller/Las Gallinas, Mt Lassen/Lucas Valley
- Cost estimate
- $1,800,000
Shoreline Hwy Tam Junction Midblock Crosswalk (Caltrans EP)
- Cost estimate
- $300,000
ADA Ramps at Butterfield Rd and Green Valley Ct
- Cost estimate
- $200,000
Marin City - Pedestrian Improvements Phase 2 (sub-HIP)
- Cost estimate
- $563,733
E Strawberry Dr from 131 to Belvedere - Intersection Enhancements
- Cost estimate
- $1,200,000
SFD Traffic Signal Upgrades - Various Locations
- Cost estimate
- $500,000
Marin Ave Pedestrian Improvements
- Cost estimate
- $950,000
Marinwood Drive Frontage Improvements
- Cost estimate
- $2,650,000
Redwood Hwy Frontage Road Sidewalk & Bike Lanes
- Cost estimate
- $1,475,000
Replace SFD Pedestrian Railing
- Cost estimate
- $1,000,000
Reconstruct Coyote Creek Wooden Pedestrian Bridge
- Cost estimate
- $750,000
Construct Bus Stop at Lucas Valley Rd. and Los Gamos Dr.
- Cost estimate
- $2,500,000
- Additional funds needed
- $2,500,000
Countywide Guardrail Replacement - HSIP Cycle 11
- Cost estimate
- $1,400,000
FLAP - Muir Woods Road
- Cost estimate
- $2,316,940
Pt. Reyes-Petaluma Rd MP0.43 Slip Out (2023 STORM)
- Cost estimate
- $2,775,000
2025-26 Impact Fee Projects
- Cost estimate
- $6,774,971
Paradise Drive MP 7.53 Slip Out Repair - 2023 Storm Damage
- Cost estimate
- $647,876
Mount Lassen Drive Bridge Replacement (Fund 1010)
- Cost estimate
- $2,612,712
Mountain View Bridge Replacement
- Cost estimate
- $7,300,000
Sir Francis Drake Boulevard Bridge Replacement
- Cost estimate
- $7,300,000
Lucas Valley Road at Miller Creek Bridge Replacement
- Cost estimate
- $18,000,000
Marshall Petaluma at Salmon Creek Bridge Replacement
- Cost estimate
- $6,263,640
Nicasio Valley Road Bridge Replacement
- Cost estimate
- $7,300,000
Novato Blvd-Bowman Vehicular Bridge Replacement
- Cost estimate
- $6,250,000
FLAP - Pierce Point Road
- Cost estimate
- $1,455,000
Marin County Sign Inventory and Safety Audit - HSIP (Fed) Cycle 7
- Cost estimate
- $1,421,951
HAWK at Pt. San Pedro Rd & Summit Ave - HSIP Cycle 10
- Cost estimate
- $484,587
2026 Pavement Surface Treatment
- Cost estimate
- $2,474,433
2026 Pavement Digout Project
- Cost estimate
- $500,512
Sylvan Way Retaining Wall
- Cost estimate
- $200,000
Lomita Drive Pavement Rehabilitation
- Cost estimate
- $2,375,000
Guardrail Maintenance, Repair and Installation
- Cost estimate
- $600,000
Fairfax-Bolinas Rd MP 9.73 Slide Repair (FEMA2023 STORM)
- Cost estimate
- $752,505
Panoramic Hwy (Shoreline Hwy to Gravity Car) Shoulder Widening & Turnouts
- Cost estimate
- $1,875,000
Pt Reyes Petaluma Rd (Nicasio Valley Rd to Novato Blvd) Shoulder Widening
- Cost estimate
- $1,875,000
Rule 20A - Utility Undergrounding Redwood Hwy Frontage Road
- Cost estimate
- $2,810,591
Lucas Valley Rd MP 4.75 Slide Repair (CA23-6)
- Cost estimate
- $695,000
81 Madrone Slide Repair
- Cost estimate
- $210,000
2026 Minor Slide Repair Projects
- Cost estimate
- $200,000
Wharf Road Slide Repair (FEMA) #95
- Cost estimate
- $345,816
Panoramic Highway Wall Repair ~MP6.45- Slide Repair Ph. 2
- Cost estimate
- $700,000
45 Park Street Woodacre Slip Out Repair
- Cost estimate
- $300,000
Tomales Petaluma Rd MP 3.80 Wall Replacement
- Cost estimate
- $490,000
North San Pedro Road 4.45 Slip Out
- Cost estimate
- $450,000
Bridge Deck Maintenance
- Cost estimate
- $675,000
Repair San Geronimo Bridge over Nicasio Valley Rd
- Cost estimate
- $100,000
2027 Slide Repair - Retaining Wall
- Cost estimate
- $1,000,000
2028 Slide Repair - Retaining Wall
- Cost estimate
- $1,000,000
2029 Slide Repair - Retaining Wall
- Cost estimate
- $1,000,000
2030 Slide Repair - Retaining Wall
- Cost estimate
- $1,000,000
2031 Slide Repair - Retaining Wall
- Cost estimate
- $1,000,000
SFD at Inverness Slide Repairs
- Cost estimate
- $875,000
Strawberry Ped Overcrossing - 27 0076 Evaluation and Repair
- Cost estimate
- $650,000
2026 Pavement Repairs
- Cost estimate
- $7,640,000
2024 San Geronimo Paving Phase 2 (with MMWD funding)
- Cost estimate
- $350,000
2025 Paving: Novato, Lucas Valley, Greenbrae
- Cost estimate
- $8,779,090
2025 Road Sealant Projects
- Cost estimate
- $2,670,000
2026 Marin City Pavement Resurfacing
- Cost estimate
- $610,000
2027 Pavement Preventative Maintenance (Crackseal, Digouts, etc.)
- Cost estimate
- $4,000,000
2028 Pavement Preventative Maintenance (Crackseal, Digouts, etc.)
- Cost estimate
- $4,500,000
2029 Pavement Preventative Maintenance (Crackseal, Digouts, etc.)
- Cost estimate
- $4,500,000
2030 Pavement Preventative Maintenance (Crackseal, Digouts, etc.)
- Cost estimate
- $5,800,000
2031 Pavement Preventative Maintenance (Crackseal, Digouts, etc.)
- Cost estimate
- $4,500,000
2027 Pavement Rehabilitation/Resurfacing
- Cost estimate
- $4,500,000
2028 Pavement Rehabilitation/Resurfacing
- Cost estimate
- $4,000,000
2029 Pavement Rehabilitation/Resurfacing (Inc. Parks AC)
- Cost estimate
- $4,700,000
2030 Pavement Rehabilitation/Resurfacing (Inc. Parks AC)
- Cost estimate
- $5,500,000
2031 Pavement Rehabilitation/Resurfacing (Inc. Parks AC)
- Cost estimate
- $7,700,000
2027 Pavement Surface Treatment
- Cost estimate
- $2,400,000
2028 Pavement Surface Treatment
- Cost estimate
- $2,400,000
2029 Pavement Surface Treatment
- Cost estimate
- $2,400,000
2030 Pavement Surface Treatment
- Cost estimate
- $2,400,000
2031 Pavement Surface Treatment
- Cost estimate
- $2,400,000
Panoramic Hwy Four Corners Striping & Signage
- Cost estimate
- $1,700,000
Pt San Pedro Road Sealant (Ran Rafael Co-Op Project)
- Cost estimate
- $1,000,000
Resurface Valley Ford Gericke Rd
- Cost estimate
- $700,000
Wharf Road Slide Repair @ #79
- Cost estimate
- $300,955
Fairfax Bolinas Slide Repair MP 6.95
- Cost estimate
- $920,000
Road and Bridge Flex Projects (<$75K)
- Cost estimate
- $1,400,000
Hicks Valley Road Resurfacing
- Cost estimate
- $3,300,000
Bolinas Beach Seawall Repairs
- Cost estimate
- $450,000
West Marin Compost Facility Improvements
- Cost estimate
- $2,000,000
Paradise Cay Dredge
- Cost estimate
- $2,225,000
Greenwood Cove Flood Improvement
- Cost estimate
- $3,340,000
Environmental Mitigation Maintenance Program
- Cost estimate
- $400,000
Labrea and Galerita Drainage
- Cost estimate
- $1,050,000
College Ave Corridor Study
- Cost estimate
- $100,000
Update Bike/Ped Countywide Plan
- Cost estimate
- $350,000
VMT Policy, TIAG, and Mitigation Guide
- Cost estimate
- $150,000
Prepare Airfield Pavement Mgmt System (APMS) Plan
- Cost estimate
- $80,000
Pt. San Pedro Wall Assessment
- Cost estimate
- $1,268,055
Marin City Noise Analysis
- Cost estimate
- $350,000
SFD Congestion Management/Innovation Corridor
- Cost estimate
- $500,000
Drainage Inventory Updates - Asset Management
- Cost estimate
- $300,000
Point Reyes Station Parking Study
- Cost estimate
- $100,000
Evaluate Options for New Morgue and Training Facility
- Cost estimate
- $250,000
| Select | Project | Category | Status | Cost estimate | Prior approvals | Proposed FY27 | Programmed FY28 | Programmed FY29 | Programmed FY30 | Programmed FY31 | Additional funds needed |
|---|---|---|---|---|---|---|---|---|---|---|---|
| MCFD Headquarters San Geronimo Commons | Public Safety | Ongoing | $75,000,000 | $2,928,986 | $20,000,000 | $30,000,000 | $22,071,014 | $0 | $0 | $0 | |
| Hicks Valley Fire Station Replacement | Public Safety | New | $16,000,000 | $171,372 | $5,828,628 | $10,000,000 | $0 | $0 | $0 | $0 | |
| MCFD Administration Tenant Improvements | Public Safety | Ongoing | $8,000,000 | $0 | $8,000,000 | $0 | $0 | $0 | $0 | $0 | |
| MCFD Fire Foundry - College of Marin | Public Safety | Ongoing | $30,000,000 | $0 | $30,000,000 | $0 | $0 | $0 | $0 | $0 | |
| Distributed Antenna System - 1600 Los Gamos Dr. | Public Safety | Ongoing | $2,000,000 | $0 | $2,000,000 | $0 | $0 | $0 | $0 | $0 | |
| Marin City Fire Dorm Reconfiguration | Public Safety | Ongoing | $1,500,000 | $398,000 | $1,102,000 | $0 | $0 | $0 | $0 | $0 | |
| Sheriff's Sub-Station - College of Marin | Public Safety | Ongoing | $2,000,000 | $0 | $2,000,000 | $0 | $0 | $0 | $0 | $0 | |
| Woodacre Fire Dept Bathroom Remodel | Public Safety | Ongoing | $850,000 | $350,000 | $500,000 | $0 | $0 | $0 | $0 | $0 | |
| Woodacre Fire Station Apparatus Bay Heaters | Public Safety | Ongoing | $136,775 | $136,775 | $0 | $0 | $0 | $0 | $0 | $0 | |
| Throckmorton Fire Station AC Paving | Public Safety | New | $100,000 | $0 | $0 | $0 | $100,000 | $0 | $0 | $0 | |
| Waterline Replacement at Barnaby Look Out | Public Safety | New | $250,000 | $0 | $0 | $250,000 | $0 | $0 | $0 | $0 | |
| Linda Drive Culvert Replacement | Water Resources: Drainage | Ongoing | $188,629 | $188,629 | $0 | $0 | $0 | $0 | $0 | $0 | |
| Gallinas Creek Dredge | Water Resources: Drainage | Ongoing | $11,900,000 | $0 | $1,500,000 | $1,220,000 | $5,100,000 | $40,000 | $40,000 | $4,000,000 | |
| Countywide Small Trash Capture Device Installation | Water Resources: Drainage | Ongoing | $400,000 | $0 | $400,000 | $0 | $0 | $0 | $0 | $0 | |
| Green Stormwater Infrastructure Improvement Project | Water Resources: Drainage | Ongoing | $11,000,000 | $600,000 | $5,000,000 | $5,400,000 | $0 | $0 | $0 | $0 | |
| Trash Capture Devices (Shoreline, Seminary, Goodmans, Blithedale) | Water Resources: Drainage | Ongoing | $5,678,043 | $1,000,000 | $4,678,043 | $0 | $0 | $0 | $0 | $0 | |
| Seaview Ave Drainage Improvements | Water Resources: Drainage | Ongoing | $400,000 | $400,000 | $0 | $0 | $0 | $0 | $0 | $0 | |
| 2027 Drainage Program | Water Resources: Drainage | New | $400,000 | $0 | $400,000 | $0 | $0 | $0 | $0 | $0 | |
| 2028 Drainage Program | Water Resources: Drainage | New | $400,000 | $0 | $0 | $400,000 | $0 | $0 | $0 | $0 | |
| 2029 Drainage Program | Water Resources: Drainage | New | $400,000 | $0 | $0 | $0 | $400,000 | $0 | $0 | $0 | |
| 2030 Drainage Program | Water Resources: Drainage | New | $1,500,000 | $0 | $0 | $0 | $0 | $1,500,000 | $0 | $0 | |
| 2031 Drainage Program | Water Resources: Drainage | New | $1,500,000 | $0 | $0 | $0 | $0 | $0 | $1,500,000 | $0 | |
| 432 Woodland Rd, Kent Woodland - Culvert Repair | Water Resources: Drainage | Ongoing | $187,877 | $41,530 | $146,347 | $0 | $0 | $0 | $0 | $0 | |
| 2026 Minor Drainage Projects | Water Resources: Drainage | Ongoing | $200,000 | $200,000 | $0 | $0 | $0 | $0 | $0 | $0 | |
| Bretano Way and SFD Culvert Repair | Water Resources: Drainage | Ongoing | $98,649 | $98,649 | $0 | $0 | $0 | $0 | $0 | $0 | |
| Santa Venetia Floodwall | Water Resources: Flood Control | Ongoing | $30,500,000 | $500,000 | $5,000,000 | $0 | $0 | $0 | $0 | $25,000,000 | |
| Crest Marin Pump Station Rehabilitation | Water Resources: Flood Control | Ongoing | $7,140,000 | $540,000 | $460,000 | $1,200,000 | $4,900,000 | $20,000 | $20,000 | $0 | |
| Cardinal Levee Seepage Mitigation | Water Resources: Flood Control | Ongoing | $6,400,000 | $580,000 | $720,000 | $1,000,000 | $0 | $0 | $0 | $4,100,000 | |
| Marin City Gateway Pump Station | Water Resources: Flood Control | Ongoing | $15,850,000 | $0 | $700,000 | $50,000 | $50,000 | $50,000 | $0 | $15,000,000 | |
| Novato Creek Dredge 2026 | Water Resources: Flood Control | Ongoing | $2,200,000 | $2,200,000 | $0 | $0 | $0 | $0 | $0 | $0 | |
| Mill Valley Sycamore Pump Station Rehabilitation | Water Resources: Flood Control | Ongoing | $2,700,000 | $400,000 | $600,000 | $1,700,000 | $0 | $0 | $0 | $0 | |
| East & West Creek Restoration | Water Resources: Flood Control | Ongoing | $3,660,000 | $510,000 | $890,000 | $2,200,000 | $20,000 | $20,000 | $20,000 | $0 | |
| Corte Madera Creek Flood Risk Management | Water Resources: Flood Control | Ongoing | $18,213,270 | $11,763,270 | $4,950,000 | $1,420,000 | $40,000 | $40,000 | $0 | $0 | |
| Lagoon Park Restroom Replacement | Facilities: Parks | Ongoing | $1,805,000 | $55,000 | $500,000 | $1,250,000 | $0 | $0 | $0 | $0 | |
| McInnis Park Restroom Replacement | Facilities: Parks | Ongoing | $1,750,000 | $0 | $500,000 | $1,250,000 | $0 | $0 | $0 | $0 | |
| Park AC Corte Madera Pathway | Facilities: Parks | Ongoing | $60,000 | $0 | $0 | $0 | $0 | $0 | $60,000 | $0 | |
| Lucas Valley Field Office Renovation | Facilities: Parks | Ongoing | $2,244,340 | $2,244,340 | $0 | $0 | $0 | $0 | $0 | $0 | |
| McGlashan Pathway Phase 2 | Facilities: Parks | Ongoing | $170,000 | $170,000 | $0 | $0 | $0 | $0 | $0 | $0 | |
| Mill Valley-Sausalito MUP & Marsh Adaptation (Design) | Facilities: Parks | Ongoing | $2,600,000 | $1,100,000 | $500,000 | $500,000 | $500,000 | $0 | $0 | $0 | |
| McInnis Inclusive Playground | Facilities: Parks | Ongoing | $5,424,950 | $424,950 | $0 | $0 | $0 | $0 | $0 | $5,000,000 | |
| Cascade Fountain Renovation | Facilities: Parks | Ongoing | $1,100,000 | $91,200 | $1,008,800 | $0 | $0 | $0 | $0 | $0 | |
| Point Reyes Restroom Expansion Project | Facilities: Parks | Ongoing | $3,347,000 | $347,000 | $3,000,000 | $0 | $0 | $0 | $0 | $0 | |
| Mill Valley Bridges (1 & 2) Repairs | Facilities: Parks | New | $1,000,000 | $1,000,000 | $0 | $0 | $0 | $0 | $0 | $0 | |
| Stafford Park Waterline Replacement | Facilities: Parks | New | $3,082,620 | $157,620 | $0 | $0 | $0 | $2,925,000 | $0 | $0 | |
| Lagoon Park Pathway Gap Closure | Facilities: Parks | Ongoing | $1,500,000 | $0 | $0 | $200,000 | $1,300,000 | $0 | $0 | $0 | |
| 120 N. Redwood HHS Entry/Exit Hardware | Facilities: County Facilities | New | $150,000 | $0 | $150,000 | $0 | $0 | $0 | $0 | $0 | |
| 20 NSP Roof Replacement | Facilities: County Facilities | New | $275,000 | $0 | $275,000 | $0 | $0 | $0 | $0 | $0 | |
| 120 N. Redwood HHS Path of Travel Ramp | Facilities: County Facilities | New | $330,000 | $330,000 | $0 | $0 | $0 | $0 | $0 | $0 | |
| 10 NSP Mechanical + BMS | Facilities: County Facilities | New | $2,000,000 | $0 | $0 | $100,000 | $200,000 | $1,700,000 | $0 | $0 | |
| Fairfax Library - HVAC Replacement | Facilities: County Facilities | New | $500,000 | $0 | $500,000 | $0 | $0 | $0 | $0 | $0 | |
| 120 N. Redwood HHS Cooling Tower | Facilities: County Facilities | New | $1,000,000 | $0 | $1,000,000 | $0 | $0 | $0 | $0 | $0 | |
| Novato Library Rehabilitation Project | Facilities: County Facilities | Ongoing | $9,000,000 | $500,000 | $0 | $8,500,000 | $0 | $0 | $0 | $0 | |
| Fairfax Library Rehabilitation Project | Facilities: County Facilities | New | $9,000,000 | $0 | $0 | $0 | $0 | $9,000,000 | $0 | $0 | |
| Corte Madera Library Rehabilitation Project | Facilities: County Facilities | New | $6,500,000 | $0 | $0 | $0 | $0 | $0 | $6,500,000 | $0 | |
| 20 NSP Mechanical + BMS | Facilities: County Facilities | New | $275,000 | $0 | $0 | $75,000 | $200,000 | $0 | $0 | $0 | |
| 3070-3270 HHS Kerner Campus BMS | Facilities: County Facilities | New | $1,100,000 | $0 | $0 | $0 | $250,000 | $850,000 | $0 | $0 | |
| 120 N Redwood HHS Cabling Modernization | Facilities: County Facilities | New | $1,000,000 | $0 | $400,000 | $600,000 | $0 | $0 | $0 | $0 | |
| Library Refresh at 10 Locations | Facilities: County Facilities | Ongoing | $3,500,000 | $3,500,000 | $0 | $0 | $0 | $0 | $0 | $0 | |
| 10 NSP Roof Replacement | Facilities: County Facilities | New | $275,000 | $0 | $275,000 | $0 | $0 | $0 | $0 | $0 | |
| Juvenile Service Center Mechanical + BMS | Facilities: County Facilities | New | $1,000,000 | $0 | $0 | $0 | $250,000 | $750,000 | $0 | $0 | |
| MC Jail Cell Improvements and Related Work | Facilities: County Facilities | New | $11,278,000 | $7,525,000 | $3,753,000 | $0 | $0 | $0 | $0 | $0 | |
| Juvenile Hall Accessibility | Facilities: County Facilities | Ongoing | $2,346,320 | $512,320 | $1,000,000 | $834,000 | $0 | $0 | $0 | $0 | |
| Library of Things & Library Vending | Facilities: County Facilities | New | $500,000 | $0 | $500,000 | $0 | $0 | $0 | $0 | $0 | |
| Juvenile Hall HVAC Replacement | Facilities: County Facilities | Ongoing | $2,131,000 | $2,083,422 | $47,578 | $0 | $0 | $0 | $0 | $0 | |
| Airport Fuel Farm Secondary Containment [Near Term] | Facilities: County Facilities | Ongoing | $615,000 | $40,000 | $575,000 | $0 | $0 | $0 | $0 | $0 | |
| Juvenile Hall Video System Replacement | Facilities: County Facilities | Ongoing | $3,875,000 | $170,215 | $3,704,785 | $0 | $0 | $0 | $0 | $0 | |
| Jail Entry Gate | Facilities: County Facilities | New | $1,000,000 | $0 | $150,000 | $850,000 | $0 | $0 | $0 | $0 | |
| Juvenile Hall Path of Travel Improvements | Facilities: County Facilities | Ongoing | $1,650,000 | $150,000 | $1,500,000 | $0 | $0 | $0 | $0 | $0 | |
| Nicasio Crew Space Update | Facilities: County Facilities | Ongoing | $1,100,000 | $545,000 | $555,000 | $0 | $0 | $0 | $0 | $0 | |
| 350 Ignacio Blvd. Tenant Improvements and Deferred Maintenance | Facilities: County Facilities | New | $3,000,000 | $0 | $3,000,000 | $0 | $0 | $0 | $0 | $0 | |
| Juvenile Hall Hard Wire Fire System | Facilities: County Facilities | New | $250,000 | $0 | $250,000 | $0 | $0 | $0 | $0 | $0 | |
| Marin City Fire Station HVAC Replacement | Facilities: County Facilities | New | $150,000 | $0 | $150,000 | $0 | $0 | $0 | $0 | $0 | |
| Marin County Jail Door Replacement | Facilities: County Facilities | Ongoing | $200,000 | $200,000 | $0 | $0 | $0 | $0 | $0 | $0 | |
| Jail Kitchen HVAC Replacement | Facilities: County Facilities | Ongoing | $70,000 | $70,000 | $0 | $0 | $0 | $0 | $0 | $0 | |
| Corp Yard Modernization & Safety Enhancements | Facilities: County Facilities | Ongoing | $1,600,000 | $300,000 | $1,300,000 | $0 | $0 | $0 | $0 | $0 | |
| Marin Civic Center Window Film | Facilities: Civic Center | New | $2,500,000 | $0 | $1,500,000 | $1,000,000 | $0 | $0 | $0 | $0 | |
| Remove Excess Vegetation from Civic Center Building Perimeter | Facilities: Civic Center | New | $250,000 | $0 | $250,000 | $0 | $0 | $0 | $0 | $0 | |
| Refresh Civic Center Restrooms | Facilities: Civic Center | New | $1,000,000 | $0 | $1,000,000 | $0 | $0 | $0 | $0 | $0 | |
| Civic Center Library Rehabilitation Project | Facilities: Civic Center | Ongoing | $4,000,000 | $0 | $0 | $0 | $4,000,000 | $0 | $0 | $0 | |
| Civic Center Interior Wayfinding & Visitor Enhancements | Facilities: Civic Center | New | $1,000,000 | $250,000 | $750,000 | $0 | $0 | $0 | $0 | $0 | |
| Civic Center Landscaping Enhancements | Facilities: Civic Center | New | $1,750,000 | $250,000 | $1,500,000 | $0 | $0 | $0 | $0 | $0 | |
| Aim Farmers Market Parking Lot - County Grant | Facilities: Civic Center | Ongoing | $2,500,000 | $2,500,000 | $0 | $0 | $0 | $0 | $0 | $0 | |
| VMA Building Systems Rehabilitiation | Facilities: Civic Center | Ongoing | $23,987,120 | $23,987,120 | $0 | $0 | $0 | $0 | $0 | $0 | |
| Civic Center Building Frontage Safety Barriers & Fencing | Facilities: Civic Center | New | $300,000 | $0 | $300,000 | $0 | $0 | $0 | $0 | $0 | |
| Civic Center Emergency Back Up Power | Facilities: Civic Center | Ongoing | $2,170,250 | $2,170,250 | $0 | $0 | $0 | $0 | $0 | $0 | |
| Demo Concessions Building & Temp. Storage Replacement | Facilities: Civic Center | New | $800,000 | $0 | $0 | $800,000 | $0 | $0 | $0 | $0 | |
| Space Planning Misc Projects | Facilities: Civic Center | Ongoing | $2,900,919 | $400,919 | $500,000 | $500,000 | $500,000 | $500,000 | $500,000 | $0 | |
| MCC HVAC Phase 5-Air Side System -HOJ Phasing | Facilities: Civic Center | New | $20,090,548 | $0 | $0 | $0 | $1,500,000 | $8,590,548 | $10,000,000 | $0 | |
| Civic Center & Marin Center Exterior Lighting Replacement | Facilities: Civic Center | Ongoing | $12,000,000 | $450,000 | $3,050,000 | $2,500,000 | $4,500,000 | $1,500,000 | $0 | $0 | |
| Civic Center HVAC Chilled Water Plant | Facilities: Civic Center | Ongoing | $14,600,000 | $1,525,000 | $0 | $13,075,000 | $0 | $0 | $0 | $0 | |
| MCC HVAC Phase 6- Air Side System Admin Building | Facilities: Civic Center | New | $14,123,324 | $0 | $0 | $0 | $0 | $1,123,324 | $13,000,000 | $0 | |
| Dome Mats on Lagoon Island Bridges -Phase 2 [Long Term] | Facilities: Civic Center | New | $200,000 | $0 | $200,000 | $0 | $0 | $0 | $0 | $0 | |
| Install Gate at Civic Center Dumpster Access Driveway | Facilities: Civic Center | New | $10,000 | $0 | $10,000 | $0 | $0 | $0 | $0 | $0 | |
| Civic Center Café Renovations | Facilities: Civic Center | New | $12,000,000 | $900,000 | $3,000,000 | $8,100,000 | $0 | $0 | $0 | $0 | |
| Wayfinding Signage: Civic Center, VMA, and Marin Center | Facilities: Civic Center | New | $1,500,000 | $0 | $450,000 | $1,050,000 | $0 | $0 | $0 | $0 | |
| Fairgrounds Electrical Upgrades | Facilities: Civic Center | New | $3,000,000 | $0 | $3,000,000 | $0 | $0 | $0 | $0 | $0 | |
| Civic Center South Arch Ramp/Lift and Visitor Booth | Facilities: Civic Center | New | $650,000 | $0 | $0 | $650,000 | $0 | $0 | $0 | $0 | |
| MCC HVAC Phase 4-Computer Room Reliability | Facilities: Civic Center | New | $2,700,000 | $0 | $0 | $1,000,000 | $1,700,000 | $0 | $0 | $0 | |
| Peter Behr Drive Pathway & Streetscape Enhancements | Facilities: Civic Center | Ongoing | $2,321,940 | $321,940 | $2,000,000 | $0 | $0 | $0 | $0 | $0 | |
| Marin Civic Center Skylight Replacement | Facilities: Civic Center | New | $13,250,000 | $0 | $0 | $250,000 | $8,000,000 | $5,000,000 | $0 | $0 | |
| MCC HVAC Phase 3- Hot Water Plant Upgrades | Facilities: Civic Center | New | $11,710,447 | $0 | $0 | $1,000,000 | $7,710,447 | $3,000,000 | $0 | $0 | |
| Assessor/Finance Department Shared Counter Improvements | Facilities: Civic Center | New | $1,000,000 | $0 | $0 | $1,000,000 | $0 | $0 | $0 | $0 | |
| Assessor Room 212 Tenant Improvements | Facilities: Civic Center | Ongoing | $996,000 | $996,000 | $0 | $0 | $0 | $0 | $0 | $0 | |
| DOF Reorganization Rooms 209, 217, 225 | Facilities: Civic Center | Ongoing | $534,000 | $534,000 | $0 | $0 | $0 | $0 | $0 | $0 | |
| HOJ Assessor 232 - 234 19-0309 | Facilities: Civic Center | Ongoing | $680,000 | $680,000 | $0 | $0 | $0 | $0 | $0 | $0 | |
| 15-MPH Unincorporated Marin County School Zones | Transportation: Bike/Ped/Traffic | New | $141,000 | $0 | $141,000 | $0 | $0 | $0 | $0 | $0 | |
| Traffic- HSIP Cycle 12 Butterfield @ Irving Crosswalk | Transportation: Bike/Ped/Traffic | New | $350,000 | $0 | $350,000 | $0 | $0 | $0 | $0 | $0 | |
| Pt Reyes-Petaluma Rd-Nicasio Turn Pocket - HSIP Cycle 10 | Transportation: Bike/Ped/Traffic | Ongoing | $3,200,000 | $3,200,000 | $0 | $0 | $0 | $0 | $0 | $0 | |
| Active Chevron Warning Signs and HFST - Cycle 11 - (State) | Transportation: Bike/Ped/Traffic | Ongoing | $1,550,000 | $1,550,000 | $0 | $0 | $0 | $0 | $0 | $0 | |
| Traffic Safety Quick Build Projects (Marin City & Other) | Transportation: Bike/Ped/Traffic | Ongoing | $200,000 | $100,000 | $100,000 | $0 | $0 | $0 | $0 | $0 | |
| Install RRFB and Radar Signs - HSIP (State) Cycle 11 | Transportation: Bike/Ped/Traffic | Ongoing | $475,000 | $475,000 | $0 | $0 | $0 | $0 | $0 | $0 | |
| Install Radar Signs at 3 Locations - HSIP (State) Cycle 11 | Transportation: Bike/Ped/Traffic | Ongoing | $290,000 | $290,000 | $0 | $0 | $0 | $0 | $0 | $0 | |
| E. SFD Bike Enhancements Study | Transportation: Bike/Ped/Traffic | Ongoing | $791,000 | $791,000 | $0 | $0 | $0 | $0 | $0 | $0 | |
| Radar Speed Feedback Signs and Trailer - HSIP Cycle 12 | Transportation: Bike/Ped/Traffic | Ongoing | $441,180 | $232,200 | $208,980 | $0 | $0 | $0 | $0 | $0 | |
| Ricardo Lane Sidewalk | Transportation: Bike/Ped/Traffic | Ongoing | $650,000 | $75,000 | $0 | $575,000 | $0 | $0 | $0 | $0 | |
| ADA Improvement Project - Various Locations | Transportation: Bike/Ped/Traffic | Ongoing | $250,000 | $250,000 | $0 | $0 | $0 | $0 | $0 | $0 | |
| Rocky Graham Park - Marin City Crosswalk | Transportation: Bike/Ped/Traffic | Ongoing | $100,000 | $100,000 | $0 | $0 | $0 | $0 | $0 | $0 | |
| Drake and Donahue Intersection Enhancements | Transportation: Bike/Ped/Traffic | Ongoing | $600,000 | $0 | $100,000 | $0 | $500,000 | $0 | $0 | $0 | |
| East Sir Francis Drake Bay Trail Multiuse Path Gap Closure | Transportation: Bike/Ped/Traffic | New | $3,000,000 | $0 | $0 | $0 | $3,000,000 | $0 | $0 | $0 | |
| Install Radar Speed Feedback Signs | Transportation: Bike/Ped/Traffic | New | $300,000 | $60,000 | $60,000 | $60,000 | $60,000 | $60,000 | $0 | $0 | |
| College-Kent-Woodland Traffic Circle Quick Build Project | Transportation: Bike/Ped/Traffic | Ongoing | $325,000 | $25,000 | $300,000 | $0 | $0 | $0 | $0 | $0 | |
| College and SFD Reconfiguration | Transportation: Bike/Ped/Traffic | New | $300,000 | $0 | $300,000 | $0 | $0 | $0 | $0 | $0 | |
| Novato Library Pathway Rehabilitation | Transportation: Bike/Ped/Traffic | New | $1,250,000 | $0 | $1,250,000 | $0 | $0 | $0 | $0 | $0 | |
| 2027 Ped Bike and Safety Quick Build Program | Transportation: Bike/Ped/Traffic | New | $220,000 | $0 | $220,000 | $0 | $0 | $0 | $0 | $0 | |
| 2028 Ped Bike and Safety Quick Build Program | Transportation: Bike/Ped/Traffic | New | $300,000 | $0 | $0 | $300,000 | $0 | $0 | $0 | $0 | |
| 2029 Ped Bike and Safety Quick Build Program | Transportation: Bike/Ped/Traffic | New | $400,000 | $0 | $0 | $0 | $400,000 | $0 | $0 | $0 | |
| 2030 Ped Bike and Safety Quick Build Program | Transportation: Bike/Ped/Traffic | New | $500,000 | $0 | $0 | $0 | $0 | $500,000 | $0 | $0 | |
| 2031 Ped Bike and Safety Quick Build Program | Transportation: Bike/Ped/Traffic | New | $500,000 | $0 | $0 | $0 | $0 | $0 | $500,000 | $0 | |
| San Antonio Rd. Widening & Bike Lanes | Transportation: Bike/Ped/Traffic | Ongoing | $1,390,000 | $0 | $0 | $695,000 | $695,000 | $0 | $0 | $0 | |
| NSP Venetia Valley School Crosswalk Improvement (bulb outs) | Transportation: Bike/Ped/Traffic | New | $200,000 | $0 | $0 | $200,000 | $0 | $0 | $0 | $0 | |
| Marinwood New Traffic Signals: Marinwood/Miller, Miller/Las Gallinas, Mt Lassen/Lucas Valley | Transportation: Bike/Ped/Traffic | New | $1,800,000 | $0 | $50,000 | $250,000 | $1,500,000 | $0 | $0 | $0 | |
| Shoreline Hwy Tam Junction Midblock Crosswalk (Caltrans EP) | Transportation: Bike/Ped/Traffic | New | $300,000 | $0 | $300,000 | $0 | $0 | $0 | $0 | $0 | |
| ADA Ramps at Butterfield Rd and Green Valley Ct | Transportation: Bike/Ped/Traffic | New | $200,000 | $0 | $0 | $200,000 | $0 | $0 | $0 | $0 | |
| Marin City - Pedestrian Improvements Phase 2 (sub-HIP) | Transportation: Bike/Ped/Traffic | Ongoing | $563,733 | $563,733 | $0 | $0 | $0 | $0 | $0 | $0 | |
| E Strawberry Dr from 131 to Belvedere - Intersection Enhancements | Transportation: Bike/Ped/Traffic | New | $1,200,000 | $0 | $0 | $0 | $200,000 | $1,000,000 | $0 | $0 | |
| SFD Traffic Signal Upgrades - Various Locations | Transportation: Bike/Ped/Traffic | New | $500,000 | $0 | $50,000 | $450,000 | $0 | $0 | $0 | $0 | |
| Marin Ave Pedestrian Improvements | Transportation: Bike/Ped/Traffic | New | $950,000 | $70,000 | $180,000 | $700,000 | $0 | $0 | $0 | $0 | |
| Marinwood Drive Frontage Improvements | Transportation: Bike/Ped/Traffic | Ongoing | $2,650,000 | $150,000 | $2,500,000 | $0 | $0 | $0 | $0 | $0 | |
| Redwood Hwy Frontage Road Sidewalk & Bike Lanes | Transportation: Bike/Ped/Traffic | New | $1,475,000 | $275,000 | $1,200,000 | $0 | $0 | $0 | $0 | $0 | |
| Replace SFD Pedestrian Railing | Transportation: Bike/Ped/Traffic | New | $1,000,000 | $0 | $0 | $0 | $0 | $1,000,000 | $0 | $0 | |
| Reconstruct Coyote Creek Wooden Pedestrian Bridge | Transportation: Bike/Ped/Traffic | New | $750,000 | $0 | $750,000 | $0 | $0 | $0 | $0 | $0 | |
| Construct Bus Stop at Lucas Valley Rd. and Los Gamos Dr. | Transportation: Bike/Ped/Traffic | New | $2,500,000 | $0 | $0 | $0 | $0 | $0 | $0 | $2,500,000 | |
| Countywide Guardrail Replacement - HSIP Cycle 11 | Transportation: Road & Bridge | Ongoing | $1,400,000 | $600,000 | $800,000 | $0 | $0 | $0 | $0 | $0 | |
| FLAP - Muir Woods Road | Transportation: Road & Bridge | Ongoing | $2,316,940 | $740,436 | $0 | $1,576,504 | $0 | $0 | $0 | $0 | |
| Pt. Reyes-Petaluma Rd MP0.43 Slip Out (2023 STORM) | Transportation: Road & Bridge | Ongoing | $2,775,000 | $216,737 | $2,558,263 | $0 | $0 | $0 | $0 | $0 | |
| 2025-26 Impact Fee Projects | Transportation: Road & Bridge | Ongoing | $6,774,971 | $6,774,971 | $0 | $0 | $0 | $0 | $0 | $0 | |
| Paradise Drive MP 7.53 Slip Out Repair - 2023 Storm Damage | Transportation: Road & Bridge | Ongoing | $647,876 | $0 | $647,876 | $0 | $0 | $0 | $0 | $0 | |
| Mount Lassen Drive Bridge Replacement (Fund 1010) | Transportation: Road & Bridge | Ongoing | $2,612,712 | $0 | $2,612,712 | $0 | $0 | $0 | $0 | $0 | |
| Mountain View Bridge Replacement | Transportation: Road & Bridge | Ongoing | $7,300,000 | $2,400,000 | $4,900,000 | $0 | $0 | $0 | $0 | $0 | |
| Sir Francis Drake Boulevard Bridge Replacement | Transportation: Road & Bridge | Ongoing | $7,300,000 | $0 | $0 | $1,401,600 | $5,898,400 | $0 | $0 | $0 | |
| Lucas Valley Road at Miller Creek Bridge Replacement | Transportation: Road & Bridge | Ongoing | $18,000,000 | $600,000 | $0 | $0 | $3,000,000 | $14,400,000 | $0 | $0 | |
| Marshall Petaluma at Salmon Creek Bridge Replacement | Transportation: Road & Bridge | Ongoing | $6,263,640 | $626,122 | $0 | $0 | $5,637,518 | $0 | $0 | $0 | |
| Nicasio Valley Road Bridge Replacement | Transportation: Road & Bridge | Ongoing | $7,300,000 | $0 | $0 | $250,000 | $0 | $7,050,000 | $0 | $0 | |
| Novato Blvd-Bowman Vehicular Bridge Replacement | Transportation: Road & Bridge | New | $6,250,000 | $0 | $0 | $0 | $0 | $0 | $6,250,000 | $0 | |
| FLAP - Pierce Point Road | Transportation: Road & Bridge | Ongoing | $1,455,000 | $1,455,000 | $0 | $0 | $0 | $0 | $0 | $0 | |
| Marin County Sign Inventory and Safety Audit - HSIP (Fed) Cycle 7 | Transportation: Road & Bridge | Ongoing | $1,421,951 | $1,421,951 | $0 | $0 | $0 | $0 | $0 | $0 | |
| HAWK at Pt. San Pedro Rd & Summit Ave - HSIP Cycle 10 | Transportation: Road & Bridge | Ongoing | $484,587 | $484,587 | $0 | $0 | $0 | $0 | $0 | $0 | |
| 2026 Pavement Surface Treatment | Transportation: Road & Bridge | Ongoing | $2,474,433 | $2,474,433 | $0 | $0 | $0 | $0 | $0 | $0 | |
| 2026 Pavement Digout Project | Transportation: Road & Bridge | Ongoing | $500,512 | $500,512 | $0 | $0 | $0 | $0 | $0 | $0 | |
| Sylvan Way Retaining Wall | Transportation: Road & Bridge | Ongoing | $200,000 | $50,000 | $150,000 | $0 | $0 | $0 | $0 | $0 | |
| Lomita Drive Pavement Rehabilitation | Transportation: Road & Bridge | Ongoing | $2,375,000 | $0 | $0 | $0 | $0 | $2,375,000 | $0 | $0 | |
| Guardrail Maintenance, Repair and Installation | Transportation: Road & Bridge | New | $600,000 | $0 | $0 | $150,000 | $150,000 | $150,000 | $150,000 | $0 | |
| Fairfax-Bolinas Rd MP 9.73 Slide Repair (FEMA2023 STORM) | Transportation: Road & Bridge | Ongoing | $752,505 | $752,505 | $0 | $0 | $0 | $0 | $0 | $0 | |
| Panoramic Hwy (Shoreline Hwy to Gravity Car) Shoulder Widening & Turnouts | Transportation: Road & Bridge | New | $1,875,000 | $0 | $0 | $275,000 | $1,600,000 | $0 | $0 | $0 | |
| Pt Reyes Petaluma Rd (Nicasio Valley Rd to Novato Blvd) Shoulder Widening | Transportation: Road & Bridge | New | $1,875,000 | $0 | $0 | $275,000 | $1,600,000 | $0 | $0 | $0 | |
| Rule 20A - Utility Undergrounding Redwood Hwy Frontage Road | Transportation: Road & Bridge | Ongoing | $2,810,591 | $2,810,591 | $0 | $0 | $0 | $0 | $0 | $0 | |
| Lucas Valley Rd MP 4.75 Slide Repair (CA23-6) | Transportation: Road & Bridge | Ongoing | $695,000 | $0 | $0 | $695,000 | $0 | $0 | $0 | $0 | |
| 81 Madrone Slide Repair | Transportation: Road & Bridge | Ongoing | $210,000 | $14,500 | $195,500 | $0 | $0 | $0 | $0 | $0 | |
| 2026 Minor Slide Repair Projects | Transportation: Road & Bridge | Ongoing | $200,000 | $200,000 | $0 | $0 | $0 | $0 | $0 | $0 | |
| Wharf Road Slide Repair (FEMA) #95 | Transportation: Road & Bridge | Ongoing | $345,816 | $345,816 | $0 | $0 | $0 | $0 | $0 | $0 | |
| Panoramic Highway Wall Repair ~MP6.45- Slide Repair Ph. 2 | Transportation: Road & Bridge | Ongoing | $700,000 | $700,000 | $0 | $0 | $0 | $0 | $0 | $0 | |
| 45 Park Street Woodacre Slip Out Repair | Transportation: Road & Bridge | New | $300,000 | $0 | $0 | $300,000 | $0 | $0 | $0 | $0 | |
| Tomales Petaluma Rd MP 3.80 Wall Replacement | Transportation: Road & Bridge | Ongoing | $490,000 | $146,751 | $0 | $0 | $0 | $0 | $343,249 | $0 | |
| North San Pedro Road 4.45 Slip Out | Transportation: Road & Bridge | Ongoing | $450,000 | $450,000 | $0 | $0 | $0 | $0 | $0 | $0 | |
| Bridge Deck Maintenance | Transportation: Road & Bridge | New | $675,000 | $0 | $0 | $275,000 | $0 | $400,000 | $0 | $0 | |
| Repair San Geronimo Bridge over Nicasio Valley Rd | Transportation: Road & Bridge | New | $100,000 | $0 | $0 | $0 | $0 | $100,000 | $0 | $0 | |
| 2027 Slide Repair - Retaining Wall | Transportation: Road & Bridge | New | $1,000,000 | $0 | $1,000,000 | $0 | $0 | $0 | $0 | $0 | |
| 2028 Slide Repair - Retaining Wall | Transportation: Road & Bridge | New | $1,000,000 | $0 | $0 | $1,000,000 | $0 | $0 | $0 | $0 | |
| 2029 Slide Repair - Retaining Wall | Transportation: Road & Bridge | New | $1,000,000 | $0 | $0 | $0 | $1,000,000 | $0 | $0 | $0 | |
| 2030 Slide Repair - Retaining Wall | Transportation: Road & Bridge | New | $1,000,000 | $0 | $0 | $0 | $0 | $1,000,000 | $0 | $0 | |
| 2031 Slide Repair - Retaining Wall | Transportation: Road & Bridge | New | $1,000,000 | $0 | $0 | $0 | $0 | $0 | $1,000,000 | $0 | |
| SFD at Inverness Slide Repairs | Transportation: Road & Bridge | Ongoing | $875,000 | $125,000 | $500,000 | $250,000 | $0 | $0 | $0 | $0 | |
| Strawberry Ped Overcrossing - 27 0076 Evaluation and Repair | Transportation: Road & Bridge | New | $650,000 | $50,000 | $100,000 | $500,000 | $0 | $0 | $0 | $0 | |
| 2026 Pavement Repairs | Transportation: Road & Bridge | Ongoing | $7,640,000 | $7,640,000 | $0 | $0 | $0 | $0 | $0 | $0 | |
| 2024 San Geronimo Paving Phase 2 (with MMWD funding) | Transportation: Road & Bridge | Ongoing | $350,000 | $350,000 | $0 | $0 | $0 | $0 | $0 | $0 | |
| 2025 Paving: Novato, Lucas Valley, Greenbrae | Transportation: Road & Bridge | Ongoing | $8,779,090 | $8,779,090 | $0 | $0 | $0 | $0 | $0 | $0 | |
| 2025 Road Sealant Projects | Transportation: Road & Bridge | Ongoing | $2,670,000 | $2,670,000 | $0 | $0 | $0 | $0 | $0 | $0 | |
| 2026 Marin City Pavement Resurfacing | Transportation: Road & Bridge | Ongoing | $610,000 | $460,000 | $150,000 | $0 | $0 | $0 | $0 | $0 | |
| 2027 Pavement Preventative Maintenance (Crackseal, Digouts, etc.) | Transportation: Road & Bridge | New | $4,000,000 | $0 | $4,000,000 | $0 | $0 | $0 | $0 | $0 | |
| 2028 Pavement Preventative Maintenance (Crackseal, Digouts, etc.) | Transportation: Road & Bridge | New | $4,500,000 | $0 | $0 | $4,500,000 | $0 | $0 | $0 | $0 | |
| 2029 Pavement Preventative Maintenance (Crackseal, Digouts, etc.) | Transportation: Road & Bridge | New | $4,500,000 | $0 | $0 | $0 | $4,500,000 | $0 | $0 | $0 | |
| 2030 Pavement Preventative Maintenance (Crackseal, Digouts, etc.) | Transportation: Road & Bridge | New | $5,800,000 | $0 | $0 | $0 | $0 | $5,800,000 | $0 | $0 | |
| 2031 Pavement Preventative Maintenance (Crackseal, Digouts, etc.) | Transportation: Road & Bridge | New | $4,500,000 | $0 | $0 | $0 | $0 | $0 | $4,500,000 | $0 | |
| 2027 Pavement Rehabilitation/Resurfacing | Transportation: Road & Bridge | New | $4,500,000 | $0 | $4,500,000 | $0 | $0 | $0 | $0 | $0 | |
| 2028 Pavement Rehabilitation/Resurfacing | Transportation: Road & Bridge | New | $4,000,000 | $0 | $0 | $4,000,000 | $0 | $0 | $0 | $0 | |
| 2029 Pavement Rehabilitation/Resurfacing (Inc. Parks AC) | Transportation: Road & Bridge | New | $4,700,000 | $0 | $0 | $0 | $4,700,000 | $0 | $0 | $0 | |
| 2030 Pavement Rehabilitation/Resurfacing (Inc. Parks AC) | Transportation: Road & Bridge | New | $5,500,000 | $0 | $0 | $0 | $0 | $5,500,000 | $0 | $0 | |
| 2031 Pavement Rehabilitation/Resurfacing (Inc. Parks AC) | Transportation: Road & Bridge | New | $7,700,000 | $0 | $0 | $0 | $0 | $0 | $7,700,000 | $0 | |
| 2027 Pavement Surface Treatment | Transportation: Road & Bridge | New | $2,400,000 | $0 | $2,400,000 | $0 | $0 | $0 | $0 | $0 | |
| 2028 Pavement Surface Treatment | Transportation: Road & Bridge | New | $2,400,000 | $0 | $0 | $2,400,000 | $0 | $0 | $0 | $0 | |
| 2029 Pavement Surface Treatment | Transportation: Road & Bridge | New | $2,400,000 | $0 | $0 | $0 | $2,400,000 | $0 | $0 | $0 | |
| 2030 Pavement Surface Treatment | Transportation: Road & Bridge | New | $2,400,000 | $0 | $0 | $0 | $0 | $2,400,000 | $0 | $0 | |
| 2031 Pavement Surface Treatment | Transportation: Road & Bridge | New | $2,400,000 | $0 | $0 | $0 | $0 | $0 | $2,400,000 | $0 | |
| Panoramic Hwy Four Corners Striping & Signage | Transportation: Road & Bridge | Ongoing | $1,700,000 | $200,000 | $0 | $1,500,000 | $0 | $0 | $0 | $0 | |
| Pt San Pedro Road Sealant (Ran Rafael Co-Op Project) | Transportation: Road & Bridge | Ongoing | $1,000,000 | $100,000 | $900,000 | $0 | $0 | $0 | $0 | $0 | |
| Resurface Valley Ford Gericke Rd | Transportation: Road & Bridge | New | $700,000 | $20,000 | $0 | $680,000 | $0 | $0 | $0 | $0 | |
| Wharf Road Slide Repair @ #79 | Transportation: Road & Bridge | Ongoing | $300,955 | $80,955 | $0 | $220,000 | $0 | $0 | $0 | $0 | |
| Fairfax Bolinas Slide Repair MP 6.95 | Transportation: Road & Bridge | Ongoing | $920,000 | $85,038 | $0 | $834,962 | $0 | $0 | $0 | $0 | |
| Road and Bridge Flex Projects (<$75K) | Transportation: Road & Bridge | Ongoing | $1,400,000 | $1,400,000 | $0 | $0 | $0 | $0 | $0 | $0 | |
| Hicks Valley Road Resurfacing | Transportation: Road & Bridge | New | $3,300,000 | $0 | $0 | $0 | $0 | $300,000 | $3,000,000 | $0 | |
| Bolinas Beach Seawall Repairs | Transportation: Road & Bridge | Ongoing | $450,000 | $150,000 | $0 | $300,000 | $0 | $0 | $0 | $0 | |
| West Marin Compost Facility Improvements | Special Projects: Special Projects - Miscellaneous | New | $2,000,000 | $0 | $500,000 | $1,500,000 | $0 | $0 | $0 | $0 | |
| Paradise Cay Dredge | Special Projects: Special Projects - Miscellaneous | Ongoing | $2,225,000 | $100,000 | $0 | $100,000 | $800,000 | $1,200,000 | $25,000 | $0 | |
| Greenwood Cove Flood Improvement | Special Projects: Special Projects - Miscellaneous | New | $3,340,000 | $100,000 | $400,000 | $800,000 | $2,000,000 | $20,000 | $20,000 | $0 | |
| Environmental Mitigation Maintenance Program | Special Projects: Special Projects - Miscellaneous | New | $400,000 | $0 | $75,000 | $77,250 | $80,000 | $82,750 | $85,000 | $0 | |
| Labrea and Galerita Drainage | Special Projects: Special Projects - Miscellaneous | Ongoing | $1,050,000 | $89,950 | $0 | $0 | $0 | $960,050 | $0 | $0 | |
| College Ave Corridor Study | Special Projects: Studies/Assessments | New | $100,000 | $0 | $0 | $100,000 | $0 | $0 | $0 | $0 | |
| Update Bike/Ped Countywide Plan | Special Projects: Studies/Assessments | New | $350,000 | $0 | $175,000 | $175,000 | $0 | $0 | $0 | $0 | |
| VMT Policy, TIAG, and Mitigation Guide | Special Projects: Studies/Assessments | New | $150,000 | $75,000 | $75,000 | $0 | $0 | $0 | $0 | $0 | |
| Prepare Airfield Pavement Mgmt System (APMS) Plan | Special Projects: Studies/Assessments | Ongoing | $80,000 | $80,000 | $0 | $0 | $0 | $0 | $0 | $0 | |
| Pt. San Pedro Wall Assessment | Special Projects: Studies/Assessments | Ongoing | $1,268,055 | $1,268,055 | $0 | $0 | $0 | $0 | $0 | $0 | |
| Marin City Noise Analysis | Special Projects: Studies/Assessments | Ongoing | $350,000 | $350,000 | $0 | $0 | $0 | $0 | $0 | $0 | |
| SFD Congestion Management/Innovation Corridor | Special Projects: Studies/Assessments | New | $500,000 | $0 | $500,000 | $0 | $0 | $0 | $0 | $0 | |
| Drainage Inventory Updates - Asset Management | Special Projects: Studies/Assessments | New | $300,000 | $0 | $0 | $0 | $0 | $0 | $300,000 | $0 | |
| Point Reyes Station Parking Study | Special Projects: Studies/Assessments | Ongoing | $100,000 | $50,000 | $50,000 | $0 | $0 | $0 | $0 | $0 | |
| Evaluate Options for New Morgue and Training Facility | Special Projects: Studies/Assessments | New | $250,000 | $0 | $250,000 | $0 | $0 | $0 | $0 | $0 |
$542.3M
Programmed, FY 2026-27 to 2030-31
226
Projects
$733.1M
Cost estimate
$55.6M
Additional funds needed
Funding by year
Cost estimate by category
Projects by status
| Year | Funding |
|---|---|
| Proposed FY27 | $170,728,512 |
| Programmed FY28 | $129,739,316 |
| Programmed FY29 | $103,012,379 |
| Programmed FY30 | $80,906,672 |
| Programmed FY31 | $57,913,249 |
| Category | Projects | Cost estimate | Programmed |
|---|---|---|---|
| Public Safety | 11 | $135,836,775 | $131,851,642 |
| Water Resources | 22 | $120,916,468 | $53,794,390 |
| Facilities | 72 | $244,278,778 | $183,297,482 |
| Transportation | 106 | $219,588,492 | $163,006,564 |
| Special Projects | 15 | $12,463,055 | $10,350,050 |
Marin Budget shows the County of Marin budget and its Capital Improvement Plan. The figures come from the County's budget books and the Capital Improvement Plan book, read by Marin Data, and every page cites the book pages it comes from.